docs

    ↑↓ to move ↵ to open esc to close

    Corrections

    Once Business Central Connector has posted time from Clockify, a product of CAKE.com, into Microsoft Dynamics 365 Business Central, a product of Microsoft, that time belongs to your project ledger, and any correction happens there. Spainlink built the connector, and neither company did.

    Withdrawn approvals

    If a timesheet’s approval is withdrawn in Clockify after posting, nothing changes in Business Central. Its entries stay posted and are never deleted. The connector counts the withdrawal, and if the approval is not given again within 7 days, it flags each posted entry from the last 90 days for review with the reason “approval withdrawn on” the date “and not given again”.

    The same goes if the timesheet comes back. In our test workspace, withdrawing a posted timesheet, resubmitting it and approving it again wrote nothing new, because its entries were already in Business Central. How it works has the guarantee behind that.

    Changes after posting

    Posted time is never changed by the connector, and corrections are made as reversing entries. Instead, the connector flags the change for a person to look at.

    If a posted entry’s hours, date, project, task or work type change in Clockify, or it is deleted there, the next sync whose window reaches it flags it for review. When an approval starts that sync, it takes seconds. Changes to the description or the cost are not compared.

    A flagged entry reads Review Required on the Clockify Time Entries list, with a Review Reason such as “hours 1.25 to 1.5” or “deleted in Clockify”, and the sync log records Modified After Sync or Deleted In Clockify. It counts on the Needs Review tile in Business Central, and on a Needs review tile on the page in Clockify, which appears only while there are any. Spainlink is alerted as well.

    A person then decides. If the books need correcting, they post a reversing entry, below. Either way, Mark Reviewed on the list clears the flag and logs Marked As Reviewed, and only a new change raises it again.

    Time posted to Business Central What happens in Clockify? Nothing changes Flagged on Needs Review Does a person decide it needs correcting? Reversing entry in Business Central Marked as reviewed Withdrawn, thenapproved againunchanged Edited, thenapproved again Deleted Still withdrawnafter 7 days Yes No Time posted to Business Central What happens in Clockify? Nothing changes Flagged onNeeds Review Does a person decideit needs correcting? Reversing entry inBusiness Central Marked as reviewed Withdrawn, thenapproved againunchanged Edited, thenapproved again Deleted Still withdrawnafter 7 days Yes No
    Business Central never changes by itself, and a person always decides what happens next.

    Reversing entries

    A reversing entry is made by a person, in Business Central. The connector does not create it. Posted entries in Business Central are immutable, which is an accounting principle, so a correction is a new entry and never an edit.

    The entry is a project journal line with the negative quantity, against the same project, task and resource as the original. The line needs the original’s unit cost typed in as well: left alone, it takes Business Central’s own cost for that resource, not the cost from Clockify, and the money may not net. Line Type matters too. With it set to the original’s, which Clockify Posted Time shows, the line adds a negative planning line against the original. With it blank, the line adds none, so the original’s billable hours can still be invoiced.

    Say 2.5 hours from resource CL001, at a unit cost of 60.00 USD, landed on project PR00010, Installation of S-200 Server, task 110, in error. A reversing entry of minus 2.5 hours at the same unit cost nets the hours and the cost to zero. On a phone, you may need to swipe the table to reach the Cost column.

    EntryResourceProjectTaskHoursCost (USD)
    The original, posted by the connectorCL001PR000101102.5150.00
    The reversing entry, posted by a personCL001PR00010110-2.5-150.00
    NetCL001PR0001011000.00

    The project ledger then shows the original, the reversing entry and any reason the person wrote in the line’s description, which is the trail a finance team expects.

    If the hours belonged somewhere else, the person posts a replacement entry as well, at the same unit cost, and all three stay visible.

    A reversing entry is not a connector entry, so the posted figures on the tiles and charts, in Clockify and in Business Central, still include the original. The project ledger and your project statements show the net.